Client List

Our Assignments in Information Technology Services Co-working with HCL Infosystems Ltd,  TATA Consultancy Limited,  GTL Limited,  KELRTON Consultancy Services,  Dimension Data,  Sify. Sonata software, Exide Industry, UCo Banks, State Cooperative banks, TML, Narayana Hospital,

Kolkata MetroShifting & installation of RACK with Power , LAN connectivity ( if Civil work is also required for underlaying LAN & power connection.)
OS install & configuration.
JBOSS & Wild fly  installation & cluster configuration.
SAP Sybase vanilla installation & configuration.
Firewall installation & basic configuration.
Installation & configuration of Docker File  for container management of 1500 users ( as per the discussion)
End to End Application integration with middleware ( JBOSS with Docker file).
Onsite services for 3 years (as per section II of SOW)
Posting of engineer with requisite skillsets for kolkata Metro Data Center
Timings: 10:00 hrs to 18:00 hrs on MONDAY TO SATURDAY.
Beyond office hours engineer will be available onsite within 2hrs if called against a failure.
Engineer posted will have adequate exposure to HW items servers, storage including Virtualization.
  
TML
Ø  Configuration virtual cluster as per requirement suggested by Cisco
Ø  Installation of virtual ISE template & configure the VM
Ø  ISE internal configuration as per customer’s requirement as mentioned below,
ü  Existing VPN vLAN synchronization with ISE.
ü  Existing all 4 vLANs need to be connected.
ü  Guest vLAN should be isolated w.r.t all connectivity.
ü  Incoming network policy would be as per existing policy.
ü  Existing  3  network device** need to be sync* with ISE.
ü  All vLAN authentication would be from existing Active Directory.
Ø  Testing of configuration with recommended tuning
Ø  Replication of ISE as golden image
Ø  Documentation
DRDODRDO VxRail hardware all installation
ExideVxRail hardware all installation and Server Support, Backup Support,
HDCCBLHR Management Biomatrix.
WebPortal Management
Tender Portal Mangement Developmnet
Asset Management portal Development
UCODATA storage SAN Box and Backup management
PNBSupport Linux Server
Indian AirforceNorth-East India and WB, MaharashtraImplementing OFC , Network Switch installation , configuration, Laying Campus Network , WIFI configuration, BMS implementation.
United Bank Of IndiaBranches at East IndiaBrach Survey for implementation Network switch, Maintenance IT infra in Branch.
BSNL– West Bengal3g tower implementation, side survey.
Guwahati UniversityAssamLinux Web server Implementation. OS implementation, Implementing OFC , Network Switch installation , configuration, Laying Campus Network , WIFI configuration,  IMS ERP implementation.
Power GridAssamImplementing OFC , Network Switch installation , configuration, Laying Campus Network , WIFI configuration, IP Telephone Implementation.
OCBLAssamBrach Survey for implementation Network switch, Maintenance IT infra in Branch, OS implementation
GRSE KolkataWest BengalDATA center implementation Network switch, Maintenance IT infra. Tivoli storage and backup Implementation , Windows AD implementation, Exchange server migration , Tivoli Monitoring implementation.
Above 86 school West BengalLinux Web server Implementation. OS implementation, Implementing OFC , Network Switch installation , configuration, Laying Campus Network , WIFI configuration,  IMS ERP implementation.
Department of PostWest BengalBrach Survey for implementation Network switch, Maintenance IT infra in Branch.
New India Insurance LtdEastern RegionBrach Survey for implementation Network switch, Maintenance IT infra in Branch.
United India Insurance LtdEast IndiaBrach Survey for implementation Network switch, Maintenance OS Implementation in Branch.
BEITWest BengalWifi Campus Network and Data Center Implementation, Collage Library Management  
FCI  Bihar, OrishaImplementing OFC , Network Switch installation , CCTV Camera configuration, Laying Campus Network , WIFI configuration,
Relince Jio 4G implementation West Bengal4G tower implementation from scratch
Eastern RailWest BengalTicketing hardware system OFC network implementation
Hindustan CopperAll Over IndiaSurvey for implementation Network switch, Maintenance OS Implementation
KPC Medical College : Campus LAN Rose Valley : LAN, PA System, Access Control, MTS : LAN-data & voice Royal Calcutta Turf Club : Campus LAN Metalsa : Campus LAN + Data Centre Banking Sector:- 􀂉 State Bank of India patiala – West Bengal Telecommunication:- =Reliance jio 4G Education:- 􀂉 IIT Kharagpur – West Bengal 􀂉 IIM Joka – West Bengal 􀂉 Jadavpur University – Kolkata 􀂉 Techno India Colleges – West Bengal 􀂉 BEIT– West Bengal 􀂉 Institute of Cost & Works Accounts – Kolkata Government:- 􀂉 Employee Provident Fund Organisation – Howrah , Titagarh 􀂉 Department of Post (DOP) – All over WB – 200 site 􀂉 National Insurance Company – West Bengal 􀂉 ECIL – West Bengal 􀂉􀂉 Keltron – Kolkata 􀂉 Airport Authrity of India – Kolkata 􀂉 Rifle Factory Ichapur – KolkataCorporate:- 􀂅 Hindustan Lever Ltd – Kolkata 􀂅 Data Omeda ( India ) Ltd – Salt Lake 􀂅 ITC Infotech – Kolkata 􀂅 Eveready Industries Ltd – Kolkata ( H. O. ) , Taratala 􀂅 􀂅 Sahara India – Kolkata 􀂅Emami Limited – Kolkata Hotel Industries:- 􀂅 Sterling Holiday Resorts Ltd – Kolkata 􀂅 MPS Resorts Ltd. – Jhargram Hospital:- 􀂅KPC Medical College – Kolkata 􀂅 Mission Hospital – West Bengal 􀂅 = ESI Joka  Kolkata Heavy Engineering:- 􀂅 Hindusthan National Glass Ltd. – Hoogly IT & Software Industry:- 􀂅 Pecon Software – Kolkata 􀂅 Datex Omeda – Kolkata 􀂅 ANSIN SOFTWARE – Kolkata, School ERP/ IMS ERP More than 127 School , collage and institute are our valuable clients.  University: Calcutta University, IFTM University, Royal Global University, Gitam University, Singhania University,

Our Assignments (Mechanical and Electrical)

Sl.No.Job DescriptionCustomerLocationNo.Job DescriptionCustomerLocation
1Installation, Testing and Commissioning of Electrical Package as per approved drawing and direction of the engg.CENTRAL INLAND FISHERIES RESEARCH INSTITUTEKolkata – BARACKPUR16Installation, Testing and Commissioning of HVAC Electrical Package at National Institute of Technology, Rourkela, OdhisaNational Institute of Technology, Rourkela, OdhisaRourkela, Odhisa
233KV Cable laying & Electrical Erection Work at Millennia Infrastructure ECOSPACE Project.Millenia Infrastructure ECOSPACE ProjectKolkata – Rajarhat15Installation, Testing and Commissioning of HVAC Electrical Package at Matix Project, Panagarh, Bardhaman.Matix Fertilisers and chemicals Limited, Panagarh, Bardhaman.Panagarh, BardhamanWest Bengal
3Installation, Testing and Commissioning of Electrical Package as per approved drawing and direction of the engg.at Taj Gateway Kolkata Project.Taj Gateway KolkataKolkata14Installation, Testing and Commissioning of HVAC Electrical Package at Radisson Hotel Construction Project, GuwahatiRadisson Hotel, GuwahatiGuwahati
 6Installation, Testing and Commissioning of Electrical Package at Home Solution, New Town, RajarhatHome Solution Retail (I) Ltd, New TownKolkata11Installation, Testing and Commissioning of Electrical Renovation Work including Data & Voice  at Woodlands Multispeciality Hospital Ltd.,  Kolkata.Woodlands Multispeciality Hospital Ltd.,  Kolkata.Kolkata.
7Installation, Testing and Commissioning of HVAC Electrical Package at IISCO Burnpur, Asansol.Shriram EPC – IISCOIISCO10Preparation of the POP for Individual District Head Qrts. (DM), Sub-Divisional Head Qrts.(SDO),and Block Head Qrts. (BDO) under West Bengal Swan Project including all Interiors and Electricals.West Bengal Swan Project.West Bengal
8Installation, Testing and Commissioning of Electrical Package at Radission Hotel.Saraf Infraprojects Ltd.Kolkata9Preparation of the State Head Qrts (SHQ)Data Centre  under West Bengal Swan Project at Mani Bhandar Salt Lake, Sec-V Kolkata including all Interiors and Electricals.West Bengal Swan Project.West Bengal